google-site-verification: google91a5366275329c86.html


Projects

Programming

Since its founding, CTBXaviation has provided Programming of Airport Traffic Control Towers (ATCTs) to numerous airports throughout the United States.  


Services have ranged from assistance with entrance into the FAA Contract Tower (FCT) Program at General Aviation airports to design programs and consultation at large Commercial Service airports.  


CTBXaviation’s ATCT Programming services have produced results in achieving FCT status and in comprehensive design programs including FAA staffed control towers at LAS, BWI, and PHL.


Siting
Siting Studies and Reports CTBX Aviation

CTBXaviation has completed official siting reports for FAA approval signatures in conjunction with participating in their laboratory simulations at the FAA AFTIL.  We have also developed our own 3D interactive airport simulation for the siting of control towers.


The Safety Management System (SMS) used in this process is the safety assurance program that the FAA applies to their own facilities. The FAA believes that these same assurances should be placed on all facilities included in the National Airspace System (NAS). CTBX is also proficient in the Alternative Process offered in the FAA Siting Order.


Collateral siting services provided by CTBX include FAA and FCC coordination and approvals, as well as security considerations, cost estimates and space planning.


Towers / Design Services
Control Towers  and Design Services CTBX Aviation

The officers of CTBXaviation have designed control towers together since 1998.  Mr. Lally -President has completed siting, design, and equipment of more than 75 control towers in the United States over the past twenty years.


Design services to the highest standards include but are not limited to:

  • Reflect airport's identity in the architecture
  • Study local costs; labor and materials
  • Effectively adjust design parameters

Focus on systems and features which cannot be compromised such as:

  • Quality of the cab glass and equipment
  • Efficiency of a compact HVAC system
  • Control cab ergonomics 
  • Air Traffic Control Tower floor plans
  • Grounding and electrical distribution 
  • Minimum Equipment list for Contract Towers


 NAVAIDs & Communications
Control Towers  and Design Services CTBX Aviation

CTBXaviation will select quality equipment for your facility. We will provide you with specifications tailored to your needs and satisfy the FAA Minimum Equipment List. 


Our construction administration includes installation supervision and the use of a certification checklist for FAA contract tower requirements. Staff backgrounds include engineering and installation experience.

Programming Gallery


Siting Gallery

  • Tower / Design Gallery

    CTBXaviation Design Team Commentary by Brian Lally, P.E. and Alexis Martinez, P.E. on the Orlando-Melbourne International Airport Control Tower.  

        Video produced by: Eastern Engineering Group of Miami


    NAVAID Gallery
  • Share by: